Asked about Evals in the loop

What do you report from an eval run besides the pass rate?

An answer that works

Cost and latency, because changes routinely trade quality against them, and a quality-only report hides that. Also which specific cases changed state, since that is what you actually investigate.

Reading an answer is not being able to give one. The section that teaches this is Evals in the loop, 6 hours of Evaluation.

Learn this properly